ADU construction in Los Angeles
Detached ADUs, garage conversions and junior ADUs, from plans and permits through final inspection and utility hookups.
- CSLB #953868
- BBB A+
- Licensed & insured
- Free estimates
ADU services
Detached ADUs
A new backyard unit with its own kitchen, bathroom and entrance.
Garage conversions
Turn an existing garage into a legal living unit, often the fastest and most affordable ADU.
Attached ADUs and additions
An ADU built onto the main house with a separate entrance.
Junior ADUs (JADUs)
A unit of up to 500 square feet created within the existing home.
Plans and permits
Coordination of architectural plans, engineering, Title 24 energy reports and the city permit.
Utilities
Sewer, water, gas and electrical connections, including panel upgrades when needed.
Why homeowners choose Times Square Remodeling
Permits handled for you
The permit process is where most ADU projects stall. We coordinate the plans, corrections and inspections.
Licensed in California since 2010
CSLB license #953868, fully insured, BBB A+ accredited. You can verify our license on the CSLB website.
One person managing your project
You get a single point of contact who schedules the work, handles permits, keeps you updated and stays with the job until it passes final inspection.
Estimates you can compare
Every estimate is itemized by material, labor, permits and allowances, so you can compare it fairly against other bids.
How an ADU project works
Site visit
We look at your lot, access, utilities and what type of ADU fits.
Feasibility and estimate
You receive a budget estimate and a recommended plan path.
Plans and permit
Plans, engineering and energy reports are prepared and submitted to the city.
Construction
Foundation, framing, rough-ins, inspections, then insulation, drywall and finishes.
Final inspection
The city signs off, and the unit is ready to live in or rent.
Build two 800 sq ft ADUs in LA under AB 956
Starting January 1, 2027, AB 956 (Chapter 791, Statutes of 2026) amends Government Code §66323 and requires cities to ministerially approve two detached, new-construction ADUs on a lot with an existing or proposed single-family home, up from one. For your property, that's essentially a small-lot duplex by right in the backyard.
Key rules for the two units
- City can cap each at 800 sq ft of livable space
- 4-ft side and rear setbacks
- 16 ft standard height, 18 ft within 1/2 mile of major transit
- Ministerial approval, no CEQA, no discretionary hearing
- No owner-occupancy requirement under state law
- SB 1117 charges impact fees only on the space above 750 sq ft, on lots with two or fewer ADUs
Approval rules in LA
Zoning
Lot must have single-family zoning with an existing or proposed single-family home.
Detached new construction
Both ADUs must be detached new construction, not conversions.
Setbacks & code
Meet 4-ft setbacks, height limits, and building/fire code.
Impact fees
SB 1117 now charges impact fees only on the area above 750 sq ft on lots with two or fewer ADUs, so an 800-sq-ft design is billed on 50 sq ft instead of the whole unit.
LA cannot add extra discretionary hurdles. If you meet the state standards, the city must approve.
Cost breakdown — two 800 sq ft detached
LA 2026 all-in pricing for detached new construction runs $300–$500/sq ft including design, permits, and build, with typical detached ADUs at $150k–$400k total.
Per unit
800 sq ft × $350/sq ft = $280,000
Two units
$560,000 all-in
Design, engineering & permits
~$25k–$40k per unit (included above)
Site work & utilities
Biggest wild card in LA. Budget $30k–$50k extra if you need panel/service upgrades.
A value-engineered build could land closer to $500k for the pair, based on recent LA permit data tracking around $250k per detached ADU.
Rent math
LA ADUs rent for roughly $1,500/mo (studio), $2,000/mo (1-bed), $3,200/mo (2-bed). An 800 sq ft 2-bed/2-bath new build is top of that range.
Conservative scenario
$2,800/mo × 2 units = $5,600/mo = $67,200/yr gross
Net operating income
~$52k–$56k/yr after 7% vacancy, 1% maintenance, insurance, and added property tax.
Cash-on-cash return
~9–10% on $560k build cost if you own the lot free and clear, before financing.
Higher-rent areas
Beverly Hills / Westside at $3,200+ per unit pushes gross over $76k/yr.
Our playbook
We're productizing an 800-sq-ft plan you can permit repeatedly starting January 2027. Get the plans pre-checked with LADBS now so you're ready day one. Request a free consultation to model your project with financing, including a 50% cash / 50% HELOC scenario at current rates, to see your true payback period.
Two ADUs, lower fees, faster hookups: what changes January 1, 2027
California rewrote the ADU rules again in 2026. Three changes matter most to a Los Angeles homeowner planning a backyard unit, and a fourth shortens the permit process. Here is the short version, and what each one means for your lot.
Two detached ADUs by right (AB 956)
A single-family lot can now get two detached, new-construction ADUs instead of one, through ministerial approval. If your city caps the size, each unit can be limited to 800 square feet of livable space, with 4-foot side and rear setbacks. The practical ceiling stays at the house plus three units, so once both cottages are built a JADU is no longer guaranteed.
Impact fees only on the space above 750 sq ft (SB 1117)
On a lot with two or fewer ADUs, development impact fees now apply only to the floor area above 750 square feet instead of the whole unit. An 800-square-foot ADU is charged on 50 square feet. Add a third ADU to the lot and the old whole-unit formula returns, so the order you build in matters.
Deadlines for power hookups (SB 1196)
Electrical service is the delay nobody plans for: a finished, inspected ADU can sit dark while the utility processes the connection. SB 1196 directs the CPUC to set response timelines, deficiency notices and penalties for small energization projects, and lets the utility application be filed alongside the building permit. The CPUC has until September 30, 2027 to publish those timelines.
Two plan-check rounds, faster appeals (AB 1621)
Building permits are capped at two plan-check rounds, inspectors can no longer require changes to plans the city already approved without written findings, and appeals get a firm decision deadline. Fewer correction cycles takes weeks off the schedule, not days.
State law sets the floor, your city sets the details. Height limits, fire access, parking, lot coverage and how fast the counter moves all still vary, and school district fees on units of 500 square feet or more and utility connection charges were not touched by any of these bills. We check your specific lot and zoning before you spend money on plans, so you know what the two-unit version actually costs before you commit.
Send us the address for a free feasibility check, or call (800) 781-0937.
Inside an ADU build
Our crew on a Studio City project — framing, drywall and finishes coming together.
ADU projects — start to finish
From framing and sheathing through the completed build — a look at our ADU work in progress.







Financing
Financing is available through Chase, Wells Fargo and Foundation Finance, subject to lender approval. See financing options.
Areas we serve
We handle ADU projects throughout the San Fernando Valley, Los Angeles County, Ventura County and Orange County, including:
- Studio City
- Sherman Oaks
- Encino
- Tarzana
- Woodland Hills
- Calabasas
- North Hollywood
- Van Nuys
- Burbank
- Glendale
- Pasadena
- Santa Monica
- Beverly Hills
- Los Angeles
ADU questions
How big can my ADU be?
Under California law, a detached ADU can generally be up to 1,200 square feet, subject to your lot and local rules. We check what applies to your property during the site visit.
How long does it take to build an ADU?
Permitting often takes a few months, and construction of a detached ADU typically takes several more. A garage conversion is usually faster.
Can I rent out my ADU?
Generally yes. ADUs can be rented long-term. Short-term rental rules vary by city.
Do I need to live on the property?
California removed owner-occupancy requirements for most ADUs. Junior ADUs still have different rules, which we'll go over with you.
Can I build two ADUs on my lot?
Under AB 956, effective January 1, 2027, a single-family lot can get two detached new-construction ADUs through ministerial approval, subject to 4-foot side and rear setbacks and a city cap of 800 square feet of livable space per unit. We confirm what your lot and zoning allow before you commit to plans.
What are ADU impact fees now?
ADUs with 750 square feet or less of livable space pay no development impact fees. On lots with two or fewer ADUs, larger units are charged only on the area above 750 square feet. School district fees on units of 500 square feet or more and utility connection charges still apply.
How long does it take to get electrical service to a new ADU?
It varies by utility and by project. SB 1196, effective January 1, 2027, requires the CPUC to set response timelines for small energization projects and lets the utility application be filed at the same time as the building permit. We start the utility paperwork early so service is not the last thing standing between you and a tenant.
Why Hire a Licensed General Contractor?
One license, one accountable crew, one project manager — instead of coordinating five different trades yourself.
One Point of Contact
No juggling separate plumbers, electricians, and roofers — one crew, one project manager, accountable for the whole job.
Permits Pulled & Managed
We handle LADBS, city building departments, and HOAs — plan check, inspections, and final sign-off included.
CSLB-Backed Warranty
Written warranty backed by the CSLB bond. License #953868, fully insured and verified on the CSLB website.
100% PACE Financing
Financing through Renew Financial PACE — no money down, repay through your property taxes. Same-day approval.
Get a free ADU consultation
Call to schedule a site visit. We'll tell you what fits your lot and give you a written estimate.